PV Power Generation Business C channel forming machine Solar roof
Solar Roof
We will be your reliable business partner in the green energy business and international trade.

PV Power Generation Business

Content of the Business

- - Mandatory supply amount = Total generation amount of the mandatory supplier
(excluding the new renewable energy generation amount) x mandatory ratio
- Ratio of mandatory supply amount by year
(Attached table 3: The Enforcement Decree of Act on the Promotion of the Development, Use and Diffusion of New and Renewable Sources of Energy)
- Mandatory supply amount by year shall be fixed through reannouncement
in September after the preliminary announcement at the end of January of the relevant year

Renewable Energy Certificate

The weight shall be determined and notified by the Minister of Trade, Industry and Energy considering the impact on the environment, technology development and industry activation, and effect on the cost of power generation,
potential amount of natural resources, reduction of greenhouse gas emission, and the weight of REC is reexamined every three years. (If needed, the reexamination period can be reduced.)

Fixed price contract bidding system

Competitive bidders of the fixed price contract are selected and operated in order to promote the domestic PV-related industry,
support the stable fulfillment of obligation for the mandatory supply amount, and induce the stable investment of the PV power generation companies

  • Request for submission:Request for selection by mandatory power supplier

  • Announcement:Announced on the website of the New & Renewable Energy Center

  • Submission:Submitting the bidding application and attachments

  • Evaluation:Proceeding with metric evaluation of bidding price and non-metric evaluation of business statement according to the evaluation criteria

  • Selection:Selecting within the range of announced capacity in the descending order of total score

  • Distribution:Distributing the selected power plant to the mandatory power supplier

  • Contract:concluding the contract between the selected power plant and the mandatory power supplier

Procedure of carrying out the PV power generation business (RPS: Renewable Energy Portfolio Standard)

01

Field verification

Confirmation of KEPCO-linked capacity,
identification of permissible areas,
checking of the installation capacity

02

License of power generation business

Document submission and approval
of the relevant regional government

03

Permission for development activity

Document submission and approval
of the relevant local government

04

Business registration

registration in the tax office

05

Application of power supply
and demand contract

Field verification and determination of entry point,
and payment of construction cost

08

Report of construction plan

Reporting to the relevant local government,
selection of the electrical supervisor
(occurrence of supervising cost)

07

Construction of PV facilities

Civil-engineering work,
construction of structure,
electrical work, KEPCO¡¯s interconnection work

08

Pre-service inspection

Application for the inspection of the Korea Electrical Safety Corporation after the completion of the construction of the facilities

09

Power supply and demand contract

Sales of the produced electric power (monthly sales at the SMP of the Korea Electric Power Corporation)

10

Report on the start of commercial operation

Report of the documents to the relevant local government

11

Verification of installation

Installation verified by the Korea Energy Agency, signing up for the membership for the Korea Power Exchange

12

Commencement of the commercial operation

Sealing of the meter and starting the PV power generation

13

Issuance of REC

Issuance of the Renewable Energy Certificate (REC)

14

Sales of REC

Sales of REC at the spot market or bidding market (April, October)

C channel forming machine

Structure – PosMAC

Corrosion is the biggest problem in the characteristics of the PV power generation structure which is always exposed to the external environment.
We construct the eco-friendly and semi-permanent structure by using PosMAC which has 5~10 times more corrosion resistance than the general continuous galvanized iron (GI, GI(H)) with the same plating amount

  • Result of the corrosion resistance on the cross section after outdoor experimental assessment (Korea Conformity Laboratories)

  • - PosMAC3.0 shows better cross section corrosion than GI(H) and Galvalume.
    - As the ground iron of the cut surface is exposed, red rust occurs also on the cut surface of the PosMAC3.0 in the early days after outdoor exposure.
    However, over the lapse of time, POsMac3.0¡¯s unique corrosion oxide (Simonkolleite) is generated, decreasing the red rust area.
    - When the thickness of all base metal of PosMAC3.0 is over 1.6t, the cut surface is not fully covered by the Simonkolleite after a year has elapsed.
    Therefore, in that case, we recommend maintenance painting (on page 19 and 22 of the catalog).
    If the red rust is not allowed on the cut surface from the beginning of construction though the base metal is not thicker than 1.6t,
    we would like to recommend maintenance painting depending on the customers¡¯ choice.

Outdoor exposure test

Note : Result of outdoor exposure in the Seosan Chemical Industrial Complex (Oct. 2012 ~ Oct. 2014 by Korea Conformity Laboratories)

  • Occurrence of white rust on PosMAC3.0

  • PosMAC3.0 has a strong red rust resistance for protecting the ground iron by forming a white rust oxide of compact structure called Simonkolleite.
    Therefore, white rust can occur like general galvanized materials.
    In order to prevent white rust before the construction of PosMAC3.0, you should pay attention to the following:

  • Storage of materials before the construction of PosMAC3.0

  • - Coils, sheets and processed products should be stored in a dry and well-ventilated place.
    When those materials are left on the floor, white rust can be generated due to the vapor arising from the ground.
    In case of coil, lay an airtight covering like vinyl on the floor, install 5 pieces if thick lumber (recommending thicker than 10cm) on the packing material,
    and then store up the coil for good ventilation.
    - Cover the banding-packaged coils, sheets or processed products with the covering to shield from the rain and, when the rain stops,
    remove the covering to dry and eliminate the moisture inside.
    Avoid putting the banding-packaged coils, sheets or processed products on the floor in a humid environment,
    and put the vinyl on top of them as it accelerates reaction with moisture.
    - When the coils are stored for a long time, white rust can occur on the surface. Therefore, we recommend you to use the coil early on a first-in first-out basis.
    - You should use all the banding-packaged coils after unpacking and, even in unavoidable cases, use them as quickly as possible.

Galling and scratch resistance of PosMAC3.0

As PosMAC3.0 has high hardness vis-à-vis GI, its galling and scratch resistance are excellent.
Therefore, you can reduce contamination of molds drastically when pressing compared with the GI

  • Hardness of the plated layer

  • - PosMAC3.0 : Hv 110-130
    - GI : Hv 60 ~ 80
    - Galvalume: Hv 80 ~ 100

  • Experimental conditions

  • - Experiment settings: Moving distance 200mm, moving speed 20mm/sec.
    - Average friction section: Starting distance 30mm, end distance 170mm
    - Applying P-DBH treated oil

Chemical resistance of PosMAC3.0

- PosMAC3.0 has weight loss of plated layer less than the GI in the acid environment and less than galvalume in the alkaline environment.
- Especially, GI has inferior chemical resistance in the strong acidity of pH 1~2, and Galvalume in the strong alkalinity of pH 13~14.
- PosMAC3.0 has excellent chemical resistance, thereby being suitable for agricultural cattle shed or pigsty, or building materials

ESS(energy storage system)

ESS is a storage system which stores the electric power like a large water tank to be used temporarily when the power is insufficient or needed.

Configuration of ESS Container

  • Container-typed ESS

Container type: integral type/ segmented type
- Designing and constructing considering the site conditions

Electric room not required

Enhancing the system durability

Provision of the turn-key system

- Providing PV ESS of plug-in type
by capacity

Maximization of yield

- Securing the maximum system output efficiency
through system analysis

Corrective maintenance

- Reviewing the system design and feasibility
through the PV power generation data analysis

- Designing standard system
by specialized capacity

BATTERY

- Ensuring price competitiveness
through the long-term contract
with a major battery manufacturer in Korea

- Manufacturer¡¯s guarantee of battery¡¯s life time/
performance (Issuing a certificate of quality)

Total solution (PCS, PMS)

- Securing the edge in performance,
quality and price competitiveness of PV power generation and ESS product
as a professional development company of total solution

Maintenance

- Establishing a nationwide A/S network and operating the call center
(Operating A/S center in Ulsan, Gwangju, Daegu and Cheonan)

- Capable of responding to failure within 24 hours anywhere in the country after receiving a report of failure

- Prevention of failure and maintenance through a walk-around inspection

Floating PV power generation

- This system consists of the buoyant structure used for floating the PV equipment, structure connecting the floating structure,
and the mooring facility for fixing the whole facilities stably.

- -We install the balloon-type buoyant structure for the place where water level change is significant and the flow rate is fast
such as a wide reservoir or dam and the buoyancy integral type for the place where the water level change is small and the flow rate is slow
such as a pond or a small reservoir.

Comparison of daily data between the: A. Floating PV system and B. Rooftop PV system

Due to the proper temperature of the module, the power generation efficiency on land during the summer when the temperature is high is not good.
However, the efficiency on the water surface is much higher because the water temperature lowers the ambient temperature.

Solar Roof

Rooftop renewal

- Changing the old roof into a new one
by overlaying the solar roof on the top of it

Insulation

- Excellent insulation effect of the polyurethane roof panel

Design

- Innovative design of the Solar Roof and structure

Water proof

- Perfectly blocking water leak with non-exposure bolt

Roof type PV system

- The rail structure is capable
of installing the PV module without an additional structure

New renewable energy

- Eco-friendly company using the PV energy

Characteristic of Solar Roof

¢º Panel construction type of fixing first and then overlaying

¢º No exposure of fixing part – perfectly blocking water leak

¢º Internal and external double connection structure

¢º T-grooved integral urethane flame-retardant panel

¢º Installation of PV module of T-bolt connection method

¢º Installation of simple structure

¢º Reduction of construction period and cost

¢º Verified wind load bearing (45m/sec)

Comparison of Solar Roof and general panel

Comparison of installation method

Installation comparison of the Solar Roof and the general PV system

Problems when installing a general roof-type PV system
If you construct Solar Roof Panels overlaying the whole roof when newly building a structure, you can install the PV module easily, quickly and economically.
We install the PV module using T bolt without drilling holes.
There is no load burden as water leak is blocked and the structure of the PV module is simple.
We establish the PV power plant integrated with the building roof and PV module.

Solar Roof Renewal

Characteristic of Solar Roof renewal and PV power generation

- Roof renewal effect

- Capable of establishing PV power plant on any decrepit roof

- Improving the appearance of the old roof and prolonging its life

- Improving insulation effect and perfectly repairing the leakage area

- Reducing the load burden of the building with panels exclusively for renewal

- Installing PV modules without drilling by connecting with T-bolts

- Simple installation and solid structure